The Iris de Freitas room is coming along nicely, the new windows having recently been installed. The windows facing West (on the front of the building) are tinted and heat-reflecting, which will make the room a more comfortable space for all. It’s planned to be reopened in November, and we’re all very excited to see the changes!
![new windows delivered, ready to unpack](http://wordpress.aber.ac.uk/librefurb/files/2019/08/windows-in-boxes-cropped-1.jpg)
![empty space where the new windows will go](http://wordpress.aber.ac.uk/librefurb/files/2019/08/windows-to-come-2.jpg)
![From outside, the East-facing windows are to go in next](http://wordpress.aber.ac.uk/librefurb/files/2019/08/from-outside-cropped-1.jpg)