[:en]Software Engineering Project Week 6[:]

[:en]During this week I attended a meeting with Peter and Andreas to cover what needs to be completed in the design spec. I was moved to assist Andreas with completing section 6 from SEQA5, I need to write about the methods that are implemented in each class.
I met again with the group working on the design spec on the 8th to cover what we had done so far. Andreas and I need to make a few alterations and merge our documents together so they can be viewed easier. Once the documents had been merged, I began work on the feedback from the earlier meeting.
I also attended a meeting to work on refactoring the code that has been produced.

Time spent:
11 hours
(7 hours meetings)
(4 hours working)[:]