{"id":271,"date":"2017-08-01T08:49:43","date_gmt":"2017-08-01T08:49:43","guid":{"rendered":"http:\/\/wordpress.aber.ac.uk\/librefurb\/?p=271"},"modified":"2017-09-06T09:19:48","modified_gmt":"2017-09-06T09:19:48","slug":"progress-update","status":"publish","type":"post","link":"https:\/\/wordpress.aber.ac.uk\/librefurb\/2017\/08\/01\/progress-update\/","title":{"rendered":"[:en]Progress Update[:cy]Y Newyddion Diweddaraf [:]"},"content":{"rendered":"<p>[:en]We are in week 6 of building works:<\/p>\n<p>Last week, at our regular catch up with our contractors <a href=\"http:\/\/www.rldavies.co.uk\/\">RL Davies<\/a> the following progress was reported:<br \/>\n\u2022\tSet up and enabling works are completed.<br \/>\n\u2022\tThe contractors are at the end of the soft strip out and demolition phase.<br \/>\n\u2022\tThe electrical strip out has begun and the first fix is underway.<br \/>\n\u2022\tThe mechanical strip out is due to begin imminently.<br \/>\n\u2022\tA new mains board has been installed.<br \/>\nWe also discussed things like door locks, ceiling tiles and carpet tiles. <\/p>\n<p>This week there will be work happening on the air handling unit and the plumbing system. <\/p>\n<p>We are hoping to have more photos of the progress up soon.<br \/>\n[:cy]Rydym wedi cyrraedd wythnos 6 o\u2019r gwaith adeiladu:<\/p>\n<p>Yr wythnos ddiwethaf, ar \u00f4l siarad \u00e2\u2019r contractwyr, <a href=\"http:\/\/www.rldavies.co.uk\/\">RL Davies<\/a>, rhoddwyd gwybod am y cynnydd canlynol:<br \/>\n\u2022 Mae\u2019r gwaith gosod a galluogi wedi\u2019i gwblhau.<br \/>\n\u2022 Mae\u2019r contractwyr bron \u00e2 gorffen y gwaith o dynnu deunyddiau meddal allan a dymchwel.<br \/>\n\u2022 Maent wedi dechrau ar y gwaith o dynnu\u2019r deunydd trydanol ac mae\u2019r gwaith gosod cychwynnol wedi dechrau.<br \/>\n\u2022 Bydd y gwaith o dynnu\u2019r deunyddiau mecanyddol yn dechrau\u2019n fuan iawn.<br \/>\n\u2022 Maent wedi gosod bwrdd cyflenwad newydd.<\/p>\n<p>Gwnaethom hefyd drafod pethau megis cloeon y drysau, teils i\u2019r nenfwd a theils carped.<\/p>\n<p>Yr wythnos hon byddant yn gweithio ar yr uned awyru a\u2019r system blymio.<\/p>\n<p>Rydym yn gobeithio llwytho rhagor o luniau o\u2019r gwaith i fyny yn fuan.<br \/>\n[:]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[:en]We are in week 6 of building works: Last week, at our regular catch up with our contractors RL Davies the following progress was reported: \u2022 Set up and enabling works are completed. \u2022 The contractors are at the end of the soft strip out and demolition phase. \u2022 The electrical strip out has begun [&hellip;]<\/p>\n","protected":false},"author":25643,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2}},"categories":[1],"tags":[],"class_list":["post-271","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"","jetpack_shortlink":"https:\/\/wp.me\/p8o4YH-4n","jetpack_likes_enabled":true,"jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/wordpress.aber.ac.uk\/librefurb\/wp-json\/wp\/v2\/posts\/271","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/wordpress.aber.ac.uk\/librefurb\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/wordpress.aber.ac.uk\/librefurb\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/wordpress.aber.ac.uk\/librefurb\/wp-json\/wp\/v2\/users\/25643"}],"replies":[{"embeddable":true,"href":"https:\/\/wordpress.aber.ac.uk\/librefurb\/wp-json\/wp\/v2\/comments?post=271"}],"version-history":[{"count":10,"href":"https:\/\/wordpress.aber.ac.uk\/librefurb\/wp-json\/wp\/v2\/posts\/271\/revisions"}],"predecessor-version":[{"id":289,"href":"https:\/\/wordpress.aber.ac.uk\/librefurb\/wp-json\/wp\/v2\/posts\/271\/revisions\/289"}],"wp:attachment":[{"href":"https:\/\/wordpress.aber.ac.uk\/librefurb\/wp-json\/wp\/v2\/media?parent=271"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/wordpress.aber.ac.uk\/librefurb\/wp-json\/wp\/v2\/categories?post=271"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/wordpress.aber.ac.uk\/librefurb\/wp-json\/wp\/v2\/tags?post=271"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}