{"id":246,"date":"2017-07-21T09:14:59","date_gmt":"2017-07-21T09:14:59","guid":{"rendered":"http:\/\/wordpress.aber.ac.uk\/librefurb\/?p=246"},"modified":"2017-08-14T08:59:44","modified_gmt":"2017-08-14T08:59:44","slug":"work-begins","status":"publish","type":"post","link":"https:\/\/wordpress.aber.ac.uk\/librefurb\/2017\/07\/21\/work-begins\/","title":{"rendered":"[:en]Work Begins! [:cy]Dechrau ar y gwaith! [:]"},"content":{"rendered":"<p>[:en]Work on the project has begun and our contractors <a href=\"http:\/\/www.rldavies.co.uk\/\">RL Davies<\/a> are in the middle of the demolition phase of the building work. It\u2019s really exciting to see progress being made. Hoarding has gone up around the site and we have got some information posters up to ensure everyone knows what\u2019s going on behind the barrier.<br \/>\n<img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/wordpress.aber.ac.uk\/librefurb\/files\/2017\/07\/hording-blog1-300x150.jpeg\" alt=\"\" width=\"360\" height=\"180\" class=\"aligncenter size-medium wp-image-242\" srcset=\"https:\/\/wordpress.aber.ac.uk\/librefurb\/files\/2017\/07\/hording-blog1-300x150.jpeg 300w, https:\/\/wordpress.aber.ac.uk\/librefurb\/files\/2017\/07\/hording-blog1-768x384.jpeg 768w, https:\/\/wordpress.aber.ac.uk\/librefurb\/files\/2017\/07\/hording-blog1-1024x512.jpeg 1024w, https:\/\/wordpress.aber.ac.uk\/librefurb\/files\/2017\/07\/hording-blog1-712x356.jpeg 712w, https:\/\/wordpress.aber.ac.uk\/librefurb\/files\/2017\/07\/hording-blog1.jpeg 1301w\" sizes=\"auto, (max-width: 360px) 100vw, 360px\" \/><\/p>\n<p>We have also set up a display outside the temporary entrance to the library. This details the full layout of the refurbished space and also illustrates some of the furniture, colours and patterns that we will see when the work is complete. <img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/wordpress.aber.ac.uk\/librefurb\/files\/2017\/07\/IMAG1154-300x170.jpg\" alt=\"\" width=\"360\" height=\"180\" class=\"aligncenter size-medium wp-image-251\" \/><\/p>\n<p>The demolition is the noisiest stage of the project and our contractors expect it to only last another three days or so; they are also working into the evenings to minimize noise during office hours.<br \/>\nWe appreciate that there has been noise disturbance during this phase and we thank everyone for their understanding and patience while we carry out these essential works. <\/p>\n<p>Here are some images of the ongoing strip out.<br \/>\n<img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/wordpress.aber.ac.uk\/librefurb\/files\/2017\/07\/demolition-blog3-300x225.jpg\" alt=\"\" width=\"500\" height=\"230\" class=\"aligncenter size-medium wp-image-243\" \/><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/wordpress.aber.ac.uk\/librefurb\/files\/2017\/07\/demolition-blog1-300x225.jpg\" alt=\"\" width=\"500\" height=\"230\" class=\"aligncenter size-medium wp-image-245\" \/><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/wordpress.aber.ac.uk\/librefurb\/files\/2017\/07\/demolition-blog2-300x225.jpg\" alt=\"\" width=\"500\" height=\"230\" class=\"aligncenter size-medium wp-image-244\" \/><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/wordpress.aber.ac.uk\/librefurb\/files\/2017\/07\/lucyjulieblog-168x300.jpg\" alt=\"\" width=\"250\" height=\"372\" class=\"aligncenter size-medium wp-image-252\" \/><\/p>\n<p>Myself and Julie Hart, our Head Librarian and Project Executive, sporting very fashionable safety gear, on our way down to visit our contractors.  <\/p>\n<p>[:cy]<br \/>\nMae gwaith ar y prosiect wedi dechrau ac mae ein contractwyr <a href=\"http:\/\/www.rldavies.co.uk\/\">RL Davies<\/a> yng nghanol y gwaith dymchwel. Mae\u2019n hynod gyffrous gweld y cynnydd sy\u2019n cael ei wneud. Mae\u2019r palisiau wedi\u2019u codi o amgylch y safle ac rydym wedi rhoi posteri gwybodaeth i fyny i sicrhau bod pawb yn gwybod beth sy\u2019n digwydd y tu \u00f4l i\u2019r rhwystr.<br \/>\n<img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/wordpress.aber.ac.uk\/librefurb\/files\/2017\/07\/hording-blog1-300x150.jpeg\" alt=\"\" width=\"360\" height=\"180\" class=\"aligncenter size-medium wp-image-242\" srcset=\"https:\/\/wordpress.aber.ac.uk\/librefurb\/files\/2017\/07\/hording-blog1-300x150.jpeg 300w, https:\/\/wordpress.aber.ac.uk\/librefurb\/files\/2017\/07\/hording-blog1-768x384.jpeg 768w, https:\/\/wordpress.aber.ac.uk\/librefurb\/files\/2017\/07\/hording-blog1-1024x512.jpeg 1024w, https:\/\/wordpress.aber.ac.uk\/librefurb\/files\/2017\/07\/hording-blog1-712x356.jpeg 712w, https:\/\/wordpress.aber.ac.uk\/librefurb\/files\/2017\/07\/hording-blog1.jpeg 1301w\" sizes=\"auto, (max-width: 360px) 100vw, 360px\" \/><\/p>\n<p>Rydym hefyd wedi gosod arddangosfa fach y tu allan i\u2019r fynedfa dros dro i\u2019r Llyfrgell. Mae hwn yn dangos union gynllun y gofod sy\u2019n cael ei ailwampio, yn ogystal \u00e2 rhai o\u2019r dodrefn, lliwiau a phatrymau y byddwn yn eu gweld pan fydd y gwaith wedi\u2019i gwblhau. <img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/wordpress.aber.ac.uk\/librefurb\/files\/2017\/07\/IMAG1154-300x170.jpg\" alt=\"\" width=\"360\" height=\"180\" class=\"aligncenter size-medium wp-image-251\" \/><\/p>\n<p>Y gwaith dymchwel yw cam mwyaf swnllyd y prosiect ac mae ein contractwyr yn disgwyl i\u2019r gwaith bara am tua tri diwrnod arall yn unig; maent hefyd yn gweithio gyda\u2019r hwyr i leihau\u2019r s\u0175n yn ystod oriau swyddfa. Rydym yn gwerthfawrogi bod y cam hwn o\u2019r gwaith wedi bod yn swnllyd ac fe hoffem ddiolch i bawb am eu dealltwriaeth a\u2019u hamynedd wrth i ni gyflawni\u2019r gwaith hanfodol hwn. <\/p>\n<p>Dyma ambell lun o\u2019r gwaith sy\u2019n digwydd ar hyn o bryd.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/wordpress.aber.ac.uk\/librefurb\/files\/2017\/07\/demolition-blog3-300x225.jpg\" alt=\"\" width=\"500\" height=\"230\" class=\"aligncenter size-medium wp-image-243\" \/><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/wordpress.aber.ac.uk\/librefurb\/files\/2017\/07\/demolition-blog1-300x225.jpg\" alt=\"\" width=\"500\" height=\"230\" class=\"aligncenter size-medium wp-image-245\" \/><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/wordpress.aber.ac.uk\/librefurb\/files\/2017\/07\/demolition-blog2-300x225.jpg\" alt=\"\" width=\"500\" height=\"230\" class=\"aligncenter size-medium wp-image-244\" \/><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/wordpress.aber.ac.uk\/librefurb\/files\/2017\/07\/lucyjulieblog-168x300.jpg\" alt=\"\" width=\"250\" height=\"372\" class=\"aligncenter size-medium wp-image-252\" \/><\/p>\n<p>Julie Hart, ein Prif Lyfrgellydd a Swyddog Gweithredol y Prosiect, a minnau yn gwisgo offer diogelwch hynod ffasiynol, ar ein ffordd i ymweld \u00e2\u2019r contractwyr.<br \/>\n[:]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[:en]Work on the project has begun and our contractors RL Davies are in the middle of the demolition phase of the building work. It\u2019s really exciting to see progress being made. Hoarding has gone up around the site and we have got some information posters up to ensure everyone knows what\u2019s going on behind the [&hellip;]<\/p>\n","protected":false},"author":25643,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2}},"categories":[1],"tags":[],"class_list":["post-246","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"","jetpack_shortlink":"https:\/\/wp.me\/p8o4YH-3Y","jetpack_likes_enabled":true,"jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/wordpress.aber.ac.uk\/librefurb\/wp-json\/wp\/v2\/posts\/246","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/wordpress.aber.ac.uk\/librefurb\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/wordpress.aber.ac.uk\/librefurb\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/wordpress.aber.ac.uk\/librefurb\/wp-json\/wp\/v2\/users\/25643"}],"replies":[{"embeddable":true,"href":"https:\/\/wordpress.aber.ac.uk\/librefurb\/wp-json\/wp\/v2\/comments?post=246"}],"version-history":[{"count":23,"href":"https:\/\/wordpress.aber.ac.uk\/librefurb\/wp-json\/wp\/v2\/posts\/246\/revisions"}],"predecessor-version":[{"id":283,"href":"https:\/\/wordpress.aber.ac.uk\/librefurb\/wp-json\/wp\/v2\/posts\/246\/revisions\/283"}],"wp:attachment":[{"href":"https:\/\/wordpress.aber.ac.uk\/librefurb\/wp-json\/wp\/v2\/media?parent=246"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/wordpress.aber.ac.uk\/librefurb\/wp-json\/wp\/v2\/categories?post=246"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/wordpress.aber.ac.uk\/librefurb\/wp-json\/wp\/v2\/tags?post=246"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}