{"id":165,"date":"2017-06-09T14:10:10","date_gmt":"2017-06-09T14:10:10","guid":{"rendered":"http:\/\/wordpress.aber.ac.uk\/librefurb\/?p=165"},"modified":"2017-06-21T08:51:16","modified_gmt":"2017-06-21T08:51:16","slug":"hugh-owen-library-enquiry-desk-now-temporarily-relocated-from-level-d-to-e","status":"publish","type":"post","link":"https:\/\/wordpress.aber.ac.uk\/librefurb\/2017\/06\/09\/hugh-owen-library-enquiry-desk-now-temporarily-relocated-from-level-d-to-e\/","title":{"rendered":"[:en]Hugh Owen Library Enquiry Desk now temporarily relocated from Level D to E[:cy]Mae Desg Ymholiadau Llyfrgell Hugh Owen bellach wedi\u2019i symud dros dro o Lawr D i Lawr E[:]"},"content":{"rendered":"<p>[:en]This week our Library &amp; IT Enquiry Desk service opened on Level E of the Hugh Owen Library. This Enquiry Desk is located in front of the main entrance doors on Level E. Staff at the Enquiry Desk welcome your enquiries.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-167\" src=\"http:\/\/wordpress.aber.ac.uk\/librefurb\/files\/2017\/06\/IMAG17951-400x224.jpg\" alt=\"\" width=\"400\" height=\"224\" srcset=\"https:\/\/wordpress.aber.ac.uk\/librefurb\/files\/2017\/06\/IMAG17951-400x224.jpg 400w, https:\/\/wordpress.aber.ac.uk\/librefurb\/files\/2017\/06\/IMAG17951-400x224-300x168.jpg 300w\" sizes=\"auto, (max-width: 400px) 100vw, 400px\" \/><\/p>\n<p>We have been busy relocating some book collections and services in preparation for building work to start on Level D of the library. While we have signs up and around redirecting library users to the new entrance of the library and to relocated book and services inside, if you have any problems at all finding books or need any help, please do not hesitate to ask a member of our staff.<br \/>\nRemember also that you are welcome to contact us via email, phone or online chat for any support or questions about use of library \/ IT services and resources: <a href=\"https:\/\/www.aber.ac.uk\/en\/is\/help\/contactus\/\">https:\/\/www.aber.ac.uk\/en\/is\/help\/contactus\/<\/a><\/p>\n<p>Level D of the library has now been emptied of all furniture, ready for the building contractors to start work by the last week in June. This is what Level D looked like on the last day of term (last Saturday)<br \/>\n<img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-168\" src=\"http:\/\/wordpress.aber.ac.uk\/librefurb\/files\/2017\/06\/Level-D_jpg-400x225.jpg\" alt=\"\" width=\"400\" height=\"225\" srcset=\"https:\/\/wordpress.aber.ac.uk\/librefurb\/files\/2017\/06\/Level-D_jpg-400x225.jpg 400w, https:\/\/wordpress.aber.ac.uk\/librefurb\/files\/2017\/06\/Level-D_jpg-400x225-300x169.jpg 300w\" sizes=\"auto, (max-width: 400px) 100vw, 400px\" \/><\/p>\n<p>and this is Level D today, ready for refurbishment to start<br \/>\n<img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-169\" src=\"http:\/\/wordpress.aber.ac.uk\/librefurb\/files\/2017\/06\/Level-D-now-1-400x267.jpg\" alt=\"\" width=\"400\" height=\"267\" srcset=\"https:\/\/wordpress.aber.ac.uk\/librefurb\/files\/2017\/06\/Level-D-now-1-400x267.jpg 400w, https:\/\/wordpress.aber.ac.uk\/librefurb\/files\/2017\/06\/Level-D-now-1-400x267-300x200.jpg 300w\" sizes=\"auto, (max-width: 400px) 100vw, 400px\" \/><\/p>\n<p>A reminder that the Hugh Owen Library Level D refurbishment web page is at: <a href=\"https:\/\/www.aber.ac.uk\/en\/is\/news\/librefurb\/\">https:\/\/www.aber.ac.uk\/en\/is\/news\/librefurb\/ <\/a><\/p>\n<p>Thank you to all involved in relocating this service up to Level E. We&#8217;re looking forward to building work starting.<br \/>\nElizabeth[:cy]Yr wythnos hon agorodd ein Desg Ymholiadau Llyfrgell a TG ar Lawr E yn Llyfrgell Hugh Owen. Mae\u2019r Ddesg Ymholiadau hon wedi\u2019i lleoli o flaen drysau\u2019r brif fynedfa ar Lawr E. Mae\u2019r staff wrth y Ddesg Ymholiadau\u2019n croesawu eich ymholiadau.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/wordpress.aber.ac.uk\/librefurb\/files\/2017\/06\/IMAG17951-400x224-300x168.jpg\" alt=\"\" width=\"300\" height=\"168\" class=\"alignnone size-medium wp-image-167\" srcset=\"https:\/\/wordpress.aber.ac.uk\/librefurb\/files\/2017\/06\/IMAG17951-400x224-300x168.jpg 300w, https:\/\/wordpress.aber.ac.uk\/librefurb\/files\/2017\/06\/IMAG17951-400x224.jpg 400w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/p>\n<p>Rydym wedi bod yn brysur yn adleoli rhai casgliadau o lyfrau a gwasanaethau er mwyn paratoi ar gyfer dechrau\u2019r gwaith adeiladu ar Lawr D y llyfrgell. Er bod gennym arwyddion i fyny o amgylch y llyfrgell yn cyfeirio defnyddwyr y llyfrgell at y fynedfa newydd i\u2019r llyfrgell ac i\u2019r llyfrau a\u2019r gwasanaethau sydd wedi\u2019u symud, os ydych chi\u2019n cael unrhyw broblem dod o hyd i\u2019r llyfrau neu os oes arnoch angen cymorth, mae croeso i chi gysylltu ag aelod o\u2019n staff.<br \/>\nCofiwch hefyd fod croeso i chi gysylltu \u00e2 ni drwy e-bost, ff\u00f4n neu sgwrs ar-lein i gael unrhyw gymorth neu i ofyn unrhyw gwestiwn am ddefnyddio gwasanaethau ac adnoddau\u2019r llyfrgell\/TG: <a href=\"https:\/\/www.aber.ac.uk\/cy\/is\/help\/contactus\/\">https:\/\/www.aber.ac.uk\/cy\/is\/help\/contactus\/<\/a><\/p>\n<p>Mae Llawr D y llyfrgell bellach wedi cael ei wagio o\u2019r holl ddodrefn yn barod ar gyfer y contractwyr adeiladu, sy\u2019n dod i ddechrau gweithio yn ystod wythnos olaf mis Mehefin. Dyma sut olwg oedd ar Lawr D ar ddiwrnod ola\u2019r tymor (ddydd Sadwrn diwethaf)<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/wordpress.aber.ac.uk\/librefurb\/files\/2017\/06\/Level-D_jpg-400x225-300x169.jpg\" alt=\"\" width=\"300\" height=\"169\" class=\"alignnone size-medium wp-image-168\" srcset=\"https:\/\/wordpress.aber.ac.uk\/librefurb\/files\/2017\/06\/Level-D_jpg-400x225-300x169.jpg 300w, https:\/\/wordpress.aber.ac.uk\/librefurb\/files\/2017\/06\/Level-D_jpg-400x225.jpg 400w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/p>\n<p>A dyma Lawr D heddiw, yn barod ar gyfer y gwaith adnewyddu.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/wordpress.aber.ac.uk\/librefurb\/files\/2017\/06\/Level-D-now-1-400x267-300x200.jpg\" alt=\"\" width=\"300\" height=\"200\" class=\"alignnone size-medium wp-image-169\" srcset=\"https:\/\/wordpress.aber.ac.uk\/librefurb\/files\/2017\/06\/Level-D-now-1-400x267-300x200.jpg 300w, https:\/\/wordpress.aber.ac.uk\/librefurb\/files\/2017\/06\/Level-D-now-1-400x267.jpg 400w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/p>\n<p>Nodyn i\u2019ch atgoffa bod gweddalen o\u2019r gwaith adnewyddu i Lawr D Llyfrgell Hugh Owen ar gael ar: <a href=\"https:\/\/www.aber.ac.uk\/cy\/is\/news\/librefurb\/\">https:\/\/www.aber.ac.uk\/cy\/is\/news\/librefurb\/<\/a><\/p>\n<p>Diolch i bawb a gymerodd ran yn y gwaith o adleoli\u2019r gwasanaeth hwn i Lawr E. Rydym yn edrych ymlaen at weld y gwaith adeiladu yn dechrau.<\/p>\n<p>Elizabeth<br \/>\n[:]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[:en]This week our Library &amp; IT Enquiry Desk service opened on Level E of the Hugh Owen Library. This Enquiry Desk is located in front of the main entrance doors on Level E. Staff at the Enquiry Desk welcome your enquiries. We have been busy relocating some book collections and services in preparation for building [&hellip;]<\/p>\n","protected":false},"author":4241,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2}},"categories":[3],"tags":[],"class_list":["post-165","post","type-post","status-publish","format-standard","hentry","category-latest-news"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"","jetpack_shortlink":"https:\/\/wp.me\/p8o4YH-2F","jetpack_likes_enabled":true,"jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/wordpress.aber.ac.uk\/librefurb\/wp-json\/wp\/v2\/posts\/165","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/wordpress.aber.ac.uk\/librefurb\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/wordpress.aber.ac.uk\/librefurb\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/wordpress.aber.ac.uk\/librefurb\/wp-json\/wp\/v2\/users\/4241"}],"replies":[{"embeddable":true,"href":"https:\/\/wordpress.aber.ac.uk\/librefurb\/wp-json\/wp\/v2\/comments?post=165"}],"version-history":[{"count":5,"href":"https:\/\/wordpress.aber.ac.uk\/librefurb\/wp-json\/wp\/v2\/posts\/165\/revisions"}],"predecessor-version":[{"id":208,"href":"https:\/\/wordpress.aber.ac.uk\/librefurb\/wp-json\/wp\/v2\/posts\/165\/revisions\/208"}],"wp:attachment":[{"href":"https:\/\/wordpress.aber.ac.uk\/librefurb\/wp-json\/wp\/v2\/media?parent=165"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/wordpress.aber.ac.uk\/librefurb\/wp-json\/wp\/v2\/categories?post=165"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/wordpress.aber.ac.uk\/librefurb\/wp-json\/wp\/v2\/tags?post=165"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}